Bid Opportunities
______________________________________________________________________________________________________
REQUEST FOR BIDS
Sealed proposals will be received by the Griffin-Spalding Development Authority,
109 E. Solomon Street, Suite 100, Griffin, Georgia, 30223,
until:
for the Project known as:
THE LAKES AT GREEN VALLEY UTILITY INFRASTRUCTURE – PHASE III
GRIFFIN-SPALDING DEVELOPMENT AUTHORITY
at which time and place the proposals will be publicly opened and read aloud.
Proposals received after the designated time will not be considered.
The OWNER of the project is the
GRIFFIN-SPALDING DEVELOPMENT AUTHORITY.
The ENGINEER for the project is PARAGON CONSULTING GROUP, INC.
The approximate extent and character of the Work is generally described as
follows:
Installation of 5,633 linear feet
of 8” sanitary sewer, manholes and appurtenances; Installation of 8,895 linear
feet of 12” water line; and erosion and sediment control measures for all areas
of construction.
Bidding Documents/Project Manual must be obtained by prospective Bidders
at the Issuing Office: Paragon Consulting Group, Inc., 118 North Expressway,
Griffin, Georgia 30223, 770-412-7700. All contractor/vendor questions regarding
the bid should be directed to the Issuing Office via email to
jgraham@pcgeng.com.
In order to obtain a complete set of Bidding Documents/Project Manual and be on
record as an Official Bidder, Prospective Bidder shall provide a copy of current
Utility Contractors License as issued by the State of Georgia together with
non-refundable payment of $150.00.
Bidder shall also provide a letter from the Surety Company verifying the Bidder
has the bonding capacity as outlined for the project and that the Surety Company
will bond projects for Contractor as outlined in the specifications. The OWNER
is not obligated to consider a Bidder's proposal if Bidder is not on record with
the Issuing Office as having received complete Bidding Documents/Project
Manual from the Issuing Office.
A
pre-bid meeting will be held on-site Thursday, September 1, 2016
at the Lakes at Green Valley Industrial Park, at 10:00 a.m. local time.
Although attendance at the pre-bid meeting is not mandatory, all
interested parties are strongly urged to attend, as important requirements will
be discussed.
Bidding Documents/Project Manual may be reviewed at the Issuing Office: Paragon
Consulting Group, Inc., 118 North Expressway, Griffin, Georgia 30223,
770-412-7700; McGraw-Hill Construction Dodge, 881 Franklin Road SE, Suite 435,
Marietta, GA, 30067, 770-421-8732;
AGC Builders Exchange, 1940 The Exchange, Suite 300, Atlanta, GA,
30339, 678-298-4130; Reed Construction Data, 30 Technology Parkway South,
Suite 100, Norcross, GA, 30092,
770-849-6420.
The time allowed for Substantial Completion is 180 days, and the time
allowed for completion and readiness for final payment is 210 days from
the date of commencement.
Each Bid must be accompanied by a Bid Bond completed on the attached Bid Bond
Form with good and sufficient surety or sureties approved by the owner for
faithful acceptance of the contract, payable to, in favor of, and for the
protection of the OWNER in an amount equivalent to five (5%) of the total amount
payable by the terms of the contract, in lieu thereof, in the form of a
certified check, cashier's check, or cash in equal amount.
Performance and Payment Bonds, each in an amount at least equal to
110 percent of the contract amount, and a Certification of
Insurance will be required.
All Bids will remain subject to acceptance for ninety days after the day
of the Bid opening, but OWNER may, in its sole discretion, release any Bid and
return the Bid security prior to that date.
The Owner reserves the right to reject any or all Bids, to waive formalities and
re-advertise.
Paragon Consulting Group, Inc.
___________________________________________________________________________________________________